Thames Lido Logo Thames Lido Logo

A new space

The extension to the west edge of the old building is nearly complete. This building will have a ground floor entrance to the bar and restaurant and the new open kitchen. On the 1st floor we will have a large room for hosting private functions, parties, weddings and any other excuse to¬†celebrate with great food […]

Read More >

Last Roof

The last bit of roof, above the function room and kitchen building, was completed just before New Year. The roof is¬†anthracite coloured traditional corrugated steel on timber joists.    

Read More >

Function room

New builds are always quicker! Within weeks of starting the extension we now have the joists for the floor of the function room in place

Read More >

Pool Tiling

The pool tiles used at the Lido in Bristol were sourced from a visit to a huge tile exhibition in Italy back in 2006. There was never any

Read More >

Pool build

Arrival of the pool contractors. The shuttering and strengthening rods are installed prior to the arrival of the concrete which

Read More >

River view

A new section of wall was built along the north edge of the building to give the restaurant a service corridor straight

Read More >

Spa Corridor

To allow access to the new treatment rooms, we built a corridor that runs along the inside of the original south

Read More >

New Floor

In order to give us space for the massage treatment rooms, a mezzanine floor has been built along the length of the building

Read More >
123
Top